T
The Daily Insight

Why are fields not updated in transaction FB02?

Author

John Thompson

Published Feb 19, 2026

Why are fields not updated in transaction FB02?

2) In case NewGL is active, fields which are actively used in NewGL cannot be changed subsequently. The reason behind this is following: transaction FB02 only updates the line items of the entry view (BSEG). NewGL cannot be updated because in NewGL an update may involve several processes which do not allow a subsequent change of fields.

How can I change a field in FB02?

a) Special G/L indicator: if the field which is requested change in FB02 was posted in a line item with a special G/L indicator within transaction class „A” or „W” (BSEG-UMSKS = A or W), the field can only be changed if a corresponding entry in the table TBAER is maintained (V_TBAER-UMSKS).

Why are fields not changeable in special ledger?

For other components like profit centre accounting or special ledger a subsequent change in an FI document is only local. Special Ledger does not get the information about the change. Thus, in order to avoid inconsistencies between SL and FI those fields are not changeable.

Why are fields not changeable in Fi-SL?

3) Fields that are used in the FI-SL field movement are not usually changeable. The reason is that Special Ledger is only updated when the document is created. For other components like profit centre accounting or special ledger a subsequent change in an FI document is only local. Special Ledger does not get the information about the change.

When to use post-change year net operating loss?

Except as provided in subsection (h) (5) and in regulations, the net operating loss shall, for purposes of subparagraph (B), be allocated ratably to each day in the year. The term “ post-change year ” means any taxable year ending after the change date.

How to review and merge code with pull requests?

Pull requests let your team review code and give feedback on changes before merging it into the main branch. Pull requests can come from either topic branches within the same repository or from a branch in a fork of the original repository. Reviewers can step through the proposed changes, leave comments, and vote to approve or reject the code.

How to change the target branch of a pull request?

To change the target branch of an active pull request, see Change the target branch of a pull request. Complete the pull request Select Complete in the upper right of the pull request view to complete your pull request after the reviewers approve of the changes.

Are there any changes to the E-M code?

•Revised Office or Other Outpatient E/M codes 99202-99215 For the complete version of E/M Introductory guideline changes, Office or Other Outpatient (99202-99215) code changes, Prolonged Services code (99354, 99355, 99356, 99XXX) and guideline changes, see Complete E-M Guideline and Code Changes.doc.